> For the complete documentation index, see [llms.txt](https://docs.securemetrics.io/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://docs.securemetrics.io/securemetrics-risk-register/power-bi-template/risk-response.md).

# Risk Response

The Risk Response page shows the distribution of risk by the selected risk response types.

<figure><img src="/files/4ljDtwEShIqoUkDnUPe9" alt=""><figcaption></figcaption></figure>

## Risk Response Sankey Diagram

The Risk Response Sankey Diagram is the primary visual for this page. It plots a categorical field on the left and the risk response categories on the right, connecting each with streams. The size of the stream represents the total risk priority from each category.&#x20;

<figure><img src="/files/kVoyB5HZQbU0bsgSSccB" alt=""><figcaption></figcaption></figure>

The categorical field plotted by (left-hand side) can be changed using the drop down in the top right of the visual. The following categories can be selected:

* Risk Category
* Risk Owner (Individual)
* Compensating Controls
* Risk Status
* Inherent Risk Impact
* Inherent Risk Probability
* Residual Risk Impact
* Residual Risk Probability
* Target Risk Impact
* Target Risk Probability

<figure><img src="/files/MlT5NpA0gpFAK9YdVDXB" alt=""><figcaption></figcaption></figure>